Modular cloud architectures based on microservices, containers, and event-driven systems. Platform Engineering and Site Reliability Engineering ensure system availability and efficiency.
Transitioning to the cloud without clear architecture and automation leads to cost explosion, security risks, and unstable operating environments. Without structured domain boundaries and standardized platforms, heterogeneous structures emerge that are difficult to maintain.
Architecture definition: Analysis of current state, derivation of domain boundaries, and definition of target architecture.
Infrastructure automation: Introduction of Infrastructure as Code and self-service concepts for developers.
Platform setup: Implementation of platform services (CI/CD, observability, secrets management) based on standardized tools.
Monitoring and SRE: Establishment of metrics, alerting, logging, and SRE processes for continuous availability.
Operational stabilization: Transition to regular operation, team training, and ongoing optimization.
We combine architecture consulting, engineering, and operational support to create a robust, future-proof platform.
We take responsibility for cloud architecture design, platform setup, and implementation of automation and observability solutions. The client side is responsible for domain applications and feature prioritization.
Scalable, modular cloud architectures based on microservices and events.
A consistent, automated developer platform that enables fast, secure deployments.
Reduced downtime and higher system stability through SRE methods.
Lower operating costs and better resource utilization through automation and standardized processes.
Prepare your IT landscape for the cloud. We design your cloud-native architecture and establish a stable developer platform. Contact us to realize your cloud transformation securely and efficiently.